Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEP025A Mapping and Delivery Guide
Attach cords, cables and plugs to electrical equipment for connection to 1000 Va.c. or 1500 Vd.c. supply
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEP025A - Attach cords, cables and plugs to electrical equipment for connection to 1000 Va.c. or 1500 Vd.c. supply |
---|---|---|---|
Description | 1) 1.1) This unit covers attaching flexible cords, cables and plugs to electrical equipment connected to a supply up to 1,000V a.c. or 1,500V d.c. This may be incidental to or a primary and regular function of work related to a principle function in the workplace. It encompasses working safely, identifying plug configurations, selecting and using testing and measuring devices, terminating and connecting flexible cords/plugs and conductors, safety testing and reporting. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit applies to any formal recognition for this standard at the aligned AQF 2 level or higher. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)2) 2.1) CompetenciesGranting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEP024A Attach cords and plugs to electrical equipment for connection to a single phase 230 volt supply | ||
Competency Field | 5) Restricted and Specialisations |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare to attach flexible cord/cables(s) and plug(s). |
| |||||||
Element: Attach flexible cord(s)/cable(s) and plug(s). |
| |||||||
Element: Test equipment for operation and safety. |
| |||||||
Element: Locate and repair fault(s) in attached flexible cord(s) and plug(s). |
| |||||||
Element: Provide status report(s). |
|